PRODUCTS
CONTACT US

Changzhou Kodi Machinery Co.,Ltd.

Marketing office: 7F, Tongjiang Road 398-1#, Xinbei District, Changzhou 213022 China

Factory address:Zhenglu Industrial Park, Changzhou, Jiangsu, China

Tel:   +86 (519) 8696 5716
Fax:  +86 (519) 8918 5716
Hotline:  +86 15995073588

E-mail:  info@kodichina.com  
Web:    www.kodichina.com


 

Home >> News
Cleaning work after using centrifugal spray drying tower
Time:2018-08-20     Reading times:729

After using the centrifugal spray drying equipment, we should close the heating device at first and then close the feeding pump. The fan can’t stop working until the temperature of inlet air drops below 100 ℃.Next, we can clean and close the spray drying tower and dust bag filter. Finally, we turn off the main power. I need to remind you here that the whole order of closure can not be reversed, otherwise there will be unnecessary failures.




Although the spray atomizer disc inside the drying equipment is important, other related devices are also significant. Therefore, when we disassemble it, we must finish it in order. Then clean it with water. If it can’t be cleaned by water, clean it by brushing. Cleaning air filter is also necessary. But it should be noted that chlorine or other compounds should not be used when we clean the dryer in order to prevent serious corrosion and other damage to the spray dryer.




Carrageenan Processing Machine         Ribbon Mixer         Lab Spray Dryer         Drying Machine         Spray Dryer         Conveyor Dryer         Atomizer         Grinder          Seaweed Drying Machine         Fluid Bed         Belt Dryer         Vacuum Dryer         Powder Mixer         Tray Dryer         Pulverizer         Granulator        
HOME   |   CONTACT US   |   DOWNLOADS   |   
Copyright © 常州考弟机械有限公司. All Rights Reserved.   苏ICP备10083798号